Working with main contractor Excalon , work can be seen progressing on site with operatives excavating, setting construction formwork, and installing steel reinforcing mesh to enable Heavy Duty Road Crossings to be installed at locations around The Horizon Nuclear Power Wylfa Newydd site.
Work was completed 2017 for the extension of the existing Horizon Nuclear Power Wylfa Newydd site office; work carried out included all groundworks associated with the installation of prefabricated units to extend the overall footprint of the office.
Working for main contractor Jones Brothers, Ruthin, we have carried out the removal of 2km of hedgerow and stone walling under ecological watching briefs. Work included the construction of 2km of all stone boundary walls, installation of new fencing and new Clawdd walls all along Nanner Road, Tregele. Work completed on time and on budget.
The design and installation of a storm water culvert can be seen in pictures below. Full design in-house along with all construction formwork and installation of concrete on the Horizon Nuclear Power Wylfa Newydd site.Completed 2017 as part of cable diversion works on the site..
Work can be seen progressing above on the surface water drainage system used on our Westbury Mount housing package for the housing association Grwp Cynefin in Holyhead for 12 No. properties.
DU Construction were awarded a contract for Horizon Nuclear Power to demolish a number of properties and construct 2 new properties comprising of a new purpose built bat barn and a new barn owl building.
DU Construction Ltd can offer fully ticketed staff to CPCS standards . We can offer a full machine and driver package from a small domestic project to multi machine project. Our fleet at present includes a number of micro, 1, 3, 5, and 13t excavators.
Our staff are fully certified and experienced in the demolition sector. We have experience in demolishing from single properties up to 18 different buildings on the Wylfa site for Horizon Nuclear Power.