This was a full modernisation of a sea front property in Treaddur Bay by DU Construction.

Works include full strip out new electric installation and heating scheme, new bespoke oak staircase and oak flooring and porcelain floor tiles. Major structural works internally and new stainless steel balcony and flat roof terrace. New high specification aluminium double glazed windows and new external self-coloured render system. Together with full landscaping.

Work was undertaken over a 5 month duration.

Gallery

FullSizeRender (3)
FullSizeRender (4)
FullSizeRender
FullSizeRender (1)
FullSizeRender (2)
2425
2426
2427
039
299
300
301
302
303
304
305
306
307
308
303
304
305
306
307
308
  • FullSizeRender (3)
  • FullSizeRender (4)
  • FullSizeRender
  • FullSizeRender (1)
  • FullSizeRender (2)
  • 2425
  • 2426
  • 2427
  • 039
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308